Quality Inspection & CMM Metrology Laboratory | Lister Metal
Certified Metrology & Quality Assurance

Precision CMM Inspection & Non-Destructive Testing.

In high-pressure aluminum die casting and precision CNC machining, dimensional repeatability and zero-defect compliance are non-negotiable. Lister Metal maintains a temperature-controlled metrology laboratory equipped with bridge CMM coordinate measuring machines, optical projectors, hydrostatic pressure test stations, and industrial X-ray scanners to guarantee full geometric adherence to customer engineering drawings.

0.001 mm
CMM Resolution
AS9102 / PPAP
Full Inspection Audits
100% NDT
Pressure & X-Ray Checks
Precision CMM Coordinate Measuring Machine in Quality Laboratory

Complete Metrology & Validation Protocols.

From initial billet verification to serial mass-production release, we eliminate quality risks through automated measuring and empirical data logging.

Bridge CMM Dimensional Verification

Our climate-controlled CMM machines use Renishaw scanning touch probes to map complex 3D profiles, concentricity, true position, and flatness across multi-axis machined parts to within ±0.001mm.

  • Automated 3D coordinate point cloud mapping
  • GD&T true position, perpendicularity & runout
  • Full dimensional correlation with CAD models
Explore CNC Machining Tolerances

Hydrostatic & Air-Decay Leak Testing

Fluid hydraulic and engine cooling components must undergo 100% pressure tightness validation. We employ differential air-decay instruments and underwater hydrostatic rigs to detect even microscopic weeping.

  • Differential pressure decay testing down to 0.01 cc/min
  • Hydrostatic fluid burst testing up to 35 MPa
  • Custom automated clamping seal fixtures
View Zero-Leakage Case Study

NDT X-Ray & Spectrometer Analysis

To eliminate sub-surface defects before costly CNC finishing, we deploy optical emission spectrometers (OES) for alloy melt verification and industrial real-time X-ray fluoroscopy for internal porosity detection.

  • Spark emission chemical composition certification
  • Real-time X-ray porosity audit (ASTM E505)
  • Brinell & Rockwell hardness testing
Explore Vacuum Die Casting Controls

Surface Roughness & Coating Audits

Hermetic O-ring mating surfaces require mirror-like finishes, while powder-coated and anodized skins must resist severe corrosion. We test film thickness and run continuous salt spray test cycles.

  • Mitutoyo contact surface profilometer (Ra down to 0.2µm)
  • Eddy-current coating thickness gauges
  • ASTM B117 salt spray corrosion chambers (1000+ hrs)
Explore Certified Surface Treatments

Metrology Laboratory Equipment Roster.

Precision calibration records and instrument specifications deployed inside our internal quality inspection center.

Inspection Equipment Brand & Model Specs Measuring Range / Capacity Accuracy & Resolution Primary Quality Application
Bridge-Type CMM Zeiss / Hexagon Bridge CMM 1200mm x 1000mm x 800mm ±(1.5 + L/350) µm (0.001mm res) GD&T coordinate layout, bore concentricity, true position
Optical Emission Spectrometer Thermo Scientific OES Alloy Base Matrix PPM level chemical accuracy Alloy ingot verification (ADC12, A356, 6061, 7075)
Industrial X-Ray System Real-Time Digital Radiography Parts up to 600mm x 600mm 160 kV sub-surface micro-pore detection Internal void analysis, shrinkage detection, ASTM E505
Differential Air Leak Tester Cosmo Differential Sensor Vacuum up to 10.0 bar test pressure 0.01 cc/min sensitivity 100% serial leak checks for hydraulic & engine cooling parts
Surface Roughness Profiler Mitutoyo Surftest SJ Series Stylus diamond tip traversal Ra 0.01µm - 40µm range O-ring groove finish, sealing deck planarization audits

Formal Quality Documentation & Traceability

Every shipment from Lister Metal is backed by comprehensive, customer-ready quality verification records. We provide full Material Test Reports (MTRs), First Article Inspection (FAI) reports compliant with AS9102, and formal PPAP Level 3 documentation for automotive OEM partners. Critical production batches include Certificate of Compliance (COC) with complete serial traceability.

AS9102 FAI Packages PPAP Level 3 Submissions Material Test Reports (MTR) Certificate of Compliance (COC) 100% CMM Data Logs

Require Strict Quality Verification for Your Parts?

Ensure your components arrive fully certified without receiving-inspection delays. Submit your CAD models and GD&T drawings for a complete metrology inspection plan within 24 hours.

Submit CAD for Quality Review